AI INFRASTRUCTURE EVIDENCE ATLAS / REVIEWED NOVEMBER 2026

Who is investing
in AI infrastructure—
and what is real?

An independent guide to reported spending, company forecasts, public programmes and future commitments. It explains what each number includes, where it comes from and whether it describes an announcement, a project in progress or operating infrastructure.

Four company forecasts for 2026ILLUSTRATIVE PACE
$0.00B

Estimated amount by today if the annual forecasts were spread evenly across the year

Combined forecast$735B
Average per second$23,307
Amazon + Microsoft + Alphabet + Meta / company-wide forecasts, not verified AI spending / 00:00:00 local
01$500B all data centres investment in 2024
02$735B four company forecasts for 2026
03EUR 200B EU public-private investment target
04RMB 380B Alibaba company plan over three years
THE PURPOSE OF THIS ATLASINTERPRETATION, NOT ANOTHER DIRECTORY

The headline number is only the beginning.

AI infrastructure announcements mix different currencies, time periods and stages of development. This atlas does not claim to list every data centre. Its job is to make unlike claims easier to compare and to show where the evidence is incomplete.

01Separate actual investment from forecasts and targets
02Keep public funding distinct from private company spending
03Expose scope, overlap, uncertainty and original sources

01 / GLOBAL INVESTMENT

Comparing AI investment
requires careful definitions.

The International Energy Agency estimated approximately $500B of worldwide data-centre investment in 2024. This includes every type of data centre—not only facilities used for AI.

01

United States

45%

Share of global data-centre electricity use (IEA, 2024)

02

China

25%

Share of global data-centre electricity use (IEA, 2024)

03

Europe

15%

Share of global data-centre electricity use (IEA, 2024)

04

Rest of world

15%

Share of global data-centre electricity use (IEA, 2024)

$500Ball data centres / 2024
US45%
CN25%
EU15%
ROW15%

COMPANY FORECASTS FOR 2026

Four companies expect to invest about $735B

Amazon, Microsoft, Alphabet and Meta operate worldwide. Their forecasts cover their complete businesses, so these amounts are neither US-only figures nor exact measures of AI spending.

Amount announcedEUR 200M
Status and timeframeFully funded
Groningen AI Factory; government, region and EuroHPCVIEW ORIGINAL SOURCE

02 / SELECTED INFRASTRUCTURE EXAMPLES

Follow projects from plan
to operation.

This is an evidence map, not a comprehensive directory. It contains the complete official set of 19 EuroHPC AI Factories plus 19 selected public and commercial examples. Choose a marker to inspect its reported status and source.

COMPLETE EUROHPC INVENTORY

Europe has 19 AI Factories—not one.

EuroHPC selected 19 AI Factories across 16 EU Member States in three rounds ending in October 2025. All 19 are included below and on this map. Their exact operating phases vary, so the shared map status is Selected / deploying unless a newer site-specific source confirms more.

01

LUMI AI FactoryKajaani, Finland

02

HammerHAIStuttgart, Germany

03

PharosAthens, Greece

04

IT4LIABologna, Italy

05

L-AI FactoryBissen, Luxembourg

06

BSC AI FactoryBarcelona, Spain

07

MIMERLinköping, Sweden

08

AI:ATVienna, Austria

09

BRAIN++Sofia, Bulgaria

10

AI2FFrance — decentralised network

11

JAIFJülich, Germany

12

PIAST AI FactoryPoznań, Poland

13

SLAIFMaribor, Slovenia

14

CZAIOstrava, Czechia

15

LitAI FactoryVilnius, Lithuania

16

NLAIF / Dutch AI FactoryGroningen, Netherlands

17

Gaia AI FactoryKraków, Poland

18

RO AI FactoryBucharest, Romania

19

1HealthAISantiago de Compostela, Spain

STATUS
REGION
PROGRAM
38 SELECTED LOCATIONS SHOWN
COVERAGE BOUNDARY

Only the 19 EuroHPC AI Factories form a complete programme-level set. Every other marker is a deliberately selected example and must not be used to compare facility counts between countries. For broader global coverage, use the specialist databases linked in the evidence section. Markers show approximate cities or country references, not exact entrances.

REVIEWED 24 NOV 2026

03 / AI MODELS AND AGENTS

Compare leading AI models
and agent tools.

Select a model or tool to see who makes it, what it is designed for and how it can be accessed. “Open weights” means the model files can be downloaded, but the licence may still impose restrictions.

AI MODELAGENT OR TOOL
CLOSED ACCESSDOWNLOADABLE OR OPEN TOOLING
Closed/API Open weights Agent/framework
ClosedUS

GPT-6 family

Agentic coding, computer use and professional work

GPT-6.1 Sol is available in ChatGPT Work, Codex and the OpenAI APIOpenAI / VISIT WEBSITE
ClosedUS

GPT-6 Cyber

Defensive cybersecurity research and operations

Initially available in the API and Codex to approved Daybreak Red customers, with broader programme access plannedOpenAI / VISIT WEBSITE
ClosedUS

Claude 5.5 family

Coding, agents, professional work and high-volume tasks

Opus, Sonnet and Haiku 5.5 are available through Claude and the Claude Platform, with cloud-platform availability varying by modelAnthropic / VISIT WEBSITE
ClosedUS

Gemini 4 Argon

Long-horizon coding, enterprise work and defensive cybersecurity

Available to paid Gemini API customers and Google AI Pro or Ultra subscribers, with Antigravity access for Ultra subscribersGoogle DeepMind / VISIT WEBSITE
ClosedUS

Muse Wonder family

Personal and professional agents, coding and expert-domain work

Muse Wonder is available through the Meta Model API and Muse Code; Muse Wonder Full is available to Muse Code subscribersMeta / VISIT WEBSITE
ClosedUS

Grok

General assistance and current information

Available as a product and through an APIxAI / VISIT WEBSITE
Open weightsUS

Llama

Downloadable general-purpose models

Downloadable files with a custom licenceMeta / VISIT WEBSITE
Open weightsUS

Gemma

Smaller models for local use

Downloadable files under Gemma's termsGoogle DeepMind / VISIT WEBSITE
Open weightsChina

Qwen

Languages, coding and problem solving

Downloadable files and a hosted APIAlibaba / VISIT WEBSITE
Open weightsChina

DeepSeek

Problem solving and coding

Downloadable files and a hosted APIDeepSeek / VISIT WEBSITE
Open weightsEurope

Mistral

Multilingual business and developer use

Downloadable files and a hosted APIMistral AI / VISIT WEBSITE
Open weightsChina

Kimi family

Long-context coding, research, 3D creation and agentic work

K3.1 Pro is available through Kimi products and API, and its full model weights are now downloadableMoonshot AI / VISIT WEBSITE
Open weightsChina

MiniMax M3.1 Flash

Agentic workflows, coding, computer use and cybersecurity

Model files are downloadable from MiniMax's official Hugging Face repository; hosted access is also available through MiniMax API, M Plan and MiniMax CodeMiniMax / VISIT WEBSITE
AgentUS

Codex

Software development

Hosted coding agentOpenAI / VISIT WEBSITE
AgentUS

Claude Code

Software development from a terminal

Hosted agent and command-line toolAnthropic / VISIT WEBSITE
AgentUS

Gemini CLI

Open command-line coding tool

Open-source command-line toolGoogle / VISIT WEBSITE
AgentUS

Devin

Completing software tasks

Hosted coding agentCognition / VISIT WEBSITE
AgentAsia

Manus

Research and online tasks

Hosted agentManus / VISIT WEBSITE
AgentUS

LangGraph

Building agent workflows

Open-source development frameworkLangChain / VISIT WEBSITE
AgentUS

Muse

Personal tasks, web actions and background work

Available in the US through web, iOS, Android and WhatsAppMeta / VISIT WEBSITE
AgentUS

Dots

Always-on personal and enterprise work

Rolling out in eligible markets to Pro and Business Premium users; Enterprise beta is admin-enabledOpenAI / VISIT WEBSITE
AgentEurope / US

Model ML

Banking, consulting and investment workflows

Enterprise platform; company-reported deploymentsModel ML / VISIT WEBSITE

04 / CONTINUOUS MONITORING

A weekly radar for
new capital signals.

The harvesting layer watches official channels and selected international news outlets. A weekly AI research pass then checks original sources and updates the curated Atlas only when the evidence supports a material change.

Starting first collection
COLLECTION WINDOWEvery Monday at 06:15 UTC
LAST COMPLETEDAwaiting first run
SOURCE HEALTHChecking sources
WEEKLY DIGESTCURRENT ISSUE / Current weekly window

The first weekly collection is being assembled.

Official feeds and selected publisher feeds are being checked. Newly found records will appear below with their original links and discovery status.

—priority signals
—official records
—new this run
MONITORING INPUT

Source signals considered by the weekly AI review

Appearing here means a report was collected, not that an Atlas statistic changed. The AI review checks material candidates against original evidence before updating the curated data.

COLLECTINGNo discovery records have been stored yet.

The first pass runs in the background. Return shortly to see source-linked findings.

MONITORED CHANNELS6 source groups

Government sources and publisher feeds are queried directly. Every discovery links to the originating publication.

POLITICO Europe · Artificial intelligenceNews outlet / European Union
Finextra · Artificial intelligenceNews outlet / Global
TechCrunch · Artificial intelligenceNews outlet / United States / Global
US Federal RegisterGovernment / United States
European Commission Press CornerGovernment / European Union
UK Government newsGovernment / United Kingdom
Automatic updates, evidence-gated

The AI research pass promotes a finding only when original sources support a material Atlas change. Ambiguous or conflicting reports leave the statistics unchanged.

Harvest Monday at 06:15 UTC; AI evidence review follows

05 / EVIDENCE AND DEFINITIONS

Follow every claim
back to its source.

Actual investment, company forecasts, government programmes and future commitments are different kinds of information. They are kept separate and shown in their original currencies and time periods.

1

Use original sources

Prefer company filings, investor reports, government publications and intergovernmental research.

2

Separate spending from plans

A multi-year investment target is not presented as money that has already been spent.

3

Avoid double counting

Large programs may include investments announced elsewhere, so related totals are not automatically added together.

4

State what is uncertain

Ranges, missing information and spending unrelated to AI remain visible.

PROJECT EVIDENCE

One announcement can pass through five different stages.

A project is never described as operational merely because a large investment target was announced. The source must support the stage shown.

01Announced

A company or government has stated an intention. Money may not yet be committed.

02Funded

A budget, financing package or formal programme has been approved.

03Permitted

A location has entered the planning or regulatory process.

04Building

Construction or equipment installation is reported to be under way.

05Operational

The facility or computing capacity is reported as available for use.

Important limitation

No audited worldwide total for AI infrastructure investment currently exists. The IEA's $500B estimate covers all data centres in 2024. The $735B figure is a separate combination of four company-wide forecasts for 2026 and must not be read as actual global AI spending.

SPECIALIST DATABASES

Use the right source for the question.

These independent resources provide broader or deeper facility-level coverage than this atlas. They are credited here so readers can inspect the underlying landscape rather than mistake our selected map for a global inventory.

CLAIM-BY-CLAIM SOURCE LEDGER

Amounts are labelled by evidence type, period and scope.

Region / sourceAmountType / periodScope and limitations
GlobalGlobal data-centre investment
$500B
Reported2024

IEA baseline covers all data centres, not AI alone.High source confidence / VIEW SOURCE

US-based companyAmazon investment forecast
$220B
Company forecast2026

Company-wide cash capital-expenditure forecast covering technology infrastructure and other Amazon operations—not AI alone.High source confidence / VIEW SOURCE

US-based companyMicrosoft investment forecast
$175B
Company forecast2026

Company-wide forecast. The revision reflects a shift from finance to operating leases; it does not mean planned data-centre capacity fell by the same amount.High source confidence / VIEW SOURCE

US-based companyAlphabet investment forecast
$195-205B
Company forecast2026

Mostly technical infrastructure, with the vast majority supporting AI, but not exclusively AI spending. The total uses the $200B midpoint.High source confidence / VIEW SOURCE

US-based companyMeta investment forecast
$135-145B
Company forecast2026

Supports both AI infrastructure and Meta's established products. The total uses the $140B midpoint.High source confidence / VIEW SOURCE

United StatesStargate
$500B
Commitment2025-2029

A target shared by several partners, not money already spent. Some supplier investments may be included elsewhere.Medium source confidence / VIEW SOURCE

European UnionInvestAI
EUR 200B
CommitmentMulti-year

A target for investment from public and private sources. The EUR 20B AI-factory facility is included within it, not an additional amount.Medium source confidence / VIEW SOURCE

FranceAI summit announcements
EUR 109B
CommitmentMulti-year

Private announcements in France; execution schedules vary.Medium source confidence / VIEW SOURCE

FranceBull Angers AI and supercomputer factory expansion
EUR 80M
ReportedOpened 2 October 2026; wider redevelopment to 2028

The new production building is operational and doubles manufacturing capacity. The amount covers the wider Angers redevelopment, not deployed data-centre capacity; the site is therefore not counted on the data-centre map.High source confidence / VIEW SOURCE

China-based companyAlibaba AI and cloud plan
RMB 380B
CommitmentThree years

Alibaba's company plan, not a total for China as a country.High source confidence / VIEW SOURCE

European UnionEuroHPC AI Factories
19
Public programSelected through October 2025

Complete official set across 16 EU Member States. This count excludes the separate Antenna and Gigafactory programs.High source confidence / VIEW SOURCE

European UnionAI Factory Antennas
13
Public programOfficial inventory

Service extensions that broaden access to existing AI Factories; they are not counted as additional AI Factory sites on the map.High source confidence / VIEW SOURCE

European UnionFuture AI Gigafactories
Up to 5
CommitmentSeparate initiative

A different, larger-scale program. The formal selection process is separate from the 19 AI Factories.High source confidence / VIEW SOURCE

NetherlandsGroningen AI Factory
EUR 200M
Public programTo 2027

EUR 70M national, EUR 60M regional and EUR 70M EuroHPC funding.High source confidence / VIEW SOURCE

GlobalNVIDIA compute financing platforms
>$500B
CommitmentOver time

Aggregate third-party capital that six independent financing platforms aim to mobilize. It is not NVIDIA revenue, a single fund or money already deployed; definitive agreements are still required.High source confidence / VIEW SOURCE

United StatesNscale / Anthropic compute lease
$45B
Commitment6 years; capacity expected from late 2027

460 MW of planned Nscale capacity in West Virginia. This is a signed lease commitment reported independently by Reuters and the Financial Times, not capital already deployed or operational capacity.Medium source confidence / VIEW SOURCE

United StatesGoogle Wyoming data centre
$17B
CommitmentLong-term investment; supporting grid service is expected from late 2027 with peak load in 2030

Google's first Wyoming data centre. Governmental approvals and Google's acquisition of the prepared site support a Permitted classification; construction and operation remain future stages. The separate $1.8B Black Hills and $4B AEP power projects support this campus and must not be added to the $17B as independent project value.High source confidence / VIEW SOURCE

United StatesGoogle Cheyenne / Black Hills power infrastructure
$1.8B
CommitmentInvestment in 2027-2029; service from late 2027; peak load in 2030

564 MW of new company-owned generation supports up to 590 MW of grid service for Google's planned data centre. The 2.7 GW resource mix includes managed third-party power and reserves; none of these figures is data-centre IT load.High source confidence / VIEW SOURCE

United StatesGoogle / AEP Cheyenne fuel-cell project
$4B
CommitmentConstruction planned to start in 2026; full operation expected by end-2028

702 MW of planned electricity generation under a 20-year Google PPA. Construction is reported as starting in 2026, but the figure is generation capacity—not data-centre IT load—and the project is not added as a separate data-centre map location.High source confidence / VIEW SOURCE

United StatesGoogle / Constellation nuclear and power agreements
>$4.3B
CommitmentFirst uprate expected in 2028; 20-year PPA plus 15-year supply agreement

890 MW is planned new nuclear capacity; the separate 2,700 MW agreement supplies energy from existing plants. The combined 3,590 MW is contracted electricity, not data-centre IT capacity.High source confidence / VIEW SOURCE

FinlandApplied Digital Finland AI Factory plan
Up to 1 GW
CommitmentInitial power anticipated from 2028

A company-announced access agreement and preliminary campus plan. The exact site, customer, investment amount, permits and construction schedule are not public, so the capacity is not counted as operational or placed on the map.High source confidence / VIEW SOURCE

SwedenScaleway Sweden AI supercomputer
Capacity undisclosed
CommitmentAnnounced 13 October 2026; delivery date undisclosed

Scaleway's first commercial AI supercomputer outside France, using AMD Instinct MI355X GPUs with AMD ROCm software. The announcement does not disclose investment, GPU count, electrical capacity, exact site or delivery date, so no numeric total or map marker changes.High source confidence / VIEW SOURCE

United StatesAIB / Nebius CLT1 capacity contract
50 MW
Commitment12 years with two possible 5-year renewals

The parties describe a binding contract, but delivery, customer prepayments, financing and development remain future steps. The official filing does not disclose the exact site or a firm completion date.High source confidence / VIEW SOURCE

United StatesCornelis Networks infrastructure financing
$205M
FundedRaised September 2026

Company-announced financing for scale-up and scale-out ai and hpc networking products, including manufacturing and customer deployments. CN5000 shipping; CN6000 sampling with broader availability expected in Q4 2026. It is not data-centre capacity or spending already completed.High source confidence / VIEW SOURCE

US-based companyLambda GPU infrastructure term loan
$926M
ReportedTo 2030

Closed senior secured financing for GPU servers and related infrastructure supporting a committed customer deployment; separate from Lambda's May 2026 credit facility.High source confidence / VIEW SOURCE

US-based funda16z Machine Age Fund
$1.1B
Reported2026 fund

Raised for physical AI build-out spanning chips, memory, data centres, energy and robotics; it is not a data-centre-only investment total.High source confidence / VIEW SOURCE

CanadaSovereign AI Compute Strategy
CAD 2B
Public programMulti-year

Public compute strategy, including a CAD 700M compute challenge.High source confidence / VIEW SOURCE

CanadaMeta Alberta AI campus
C$13B
ReportedConstruction 2026-2029

1 GW campus, scalable to 1.8 GW. Alberta records the project as under construction; the amount excludes AI chips and its separate power plant.High source confidence / VIEW SOURCE

CanadaBell Saskatchewan AI infrastructure expansion
>C$50B
CommitmentPhased; no firm completion date

Non-binding memorandum for up to 900 MW of additional capacity, creating a path to 1.2 GW. Full buildout depends on customer commitments, commercial agreements, permits, approvals and environmental review.High source confidence / VIEW SOURCE

CanadaCanada / Cohere sovereign AI investment
Up to C$1.6B + at least C$1.7B compute
CommitmentStaged government investment; Cohere compute commitment by 2030

The federal commitment is an equity investment of up to C$1.6B made in stages. Cohere separately committed at least C$1.7B to Canadian compute by 2030; neither amount is treated as already spent.High source confidence / VIEW SOURCE

CanadaCanada joins EuroHPC
39th state
Public programJoined 2026-10-30

Access to EuroHPC high-performance, AI and quantum computing resources. Membership does not add an AI Factory location, so the official total remains 19.High source confidence / VIEW SOURCE

GermanyGermany AI Nation 2030
1+ Gigafactory; 3+ labs
Public programTargets for 2030

Policy targets; the strategy explicitly does not constitute financing decisions. The targets therefore do not change funded-programme totals or add a map location.High source confidence / VIEW SOURCE

MalaysiaGoogle Malaysia digital infrastructure
$15B
CommitmentNew investment and construction planned for 2027-2028; Elmina campus already operational

The integrated company plan covers an operational Selangor campus, planned campuses in Selangor and Negeri Sembilan, clean energy, water and skills. It is not an AI-only amount and is represented by one aggregated map marker to avoid inventing a split.High source confidence / VIEW SOURCE

SingaporeNational AI Missions for financial services
3 national missions
Public programAnnounced 2026-11-18

MAS and the Future of Finance Institute will support shared datasets, an Agentic Money Sandbox, sector capabilities and talent. No programme budget disclosed, so the record does not change capital or compute totals.High source confidence / VIEW SOURCE

United Kingdom / United StatesModel ML enterprise-agent financing
$250M
FundedSeries B; announced 2026-11-17

Company-confirmed financing at a $1.5B valuation, taking total funding to $350M. It funds an agent company and is not included in infrastructure-spending totals.High source confidence / VIEW SOURCE

United KingdomAI Research Resource expansion
GBP 1B
Public programTo 2030

Public compute expansion; separate from private data-centre investment.High source confidence / VIEW SOURCE

United KingdomUK AI investment package
GBP 600M+
Public programAnnounced ahead of the following week's Budget; individual delivery periods vary

Government-announced package spanning AI security, sovereign capability and local adoption. It includes GBP 165M for the National AI Biosecurity Initiative, of which GBP 100M funds the AI Biosecurity Lab. OpenAI and Anthropic's separate commitments are up to GBP 200M in model and compute credits, not additional public spending.High source confidence / VIEW SOURCE

LAST EVIDENCE REVIEW24 November 2026

This review added Singapore's three announced National AI Missions for financial services and their planned Agentic Money Sandbox, plus Model ML's funded $250M Series B for enterprise financial agents. Neither item changes the four-company infrastructure forecast, the selected data-centre map or EuroHPC counts: Singapore disclosed no programme budget or compute capacity, while Model ML's financing is agent-company funding rather than infrastructure spending.